Koolunga Battery Energy Storage System

Koolunga, South Australia
On track: Due 2027
Equis is developing a 200MW/800MWh Battery in Koolunga to help provide South Australia with reliable energy and decrease dependency on fossil fuels.

Community drop-in session

Project Schedule

Community drop-in session

Project Schedule

Equis completed its first community drop-in session on the 29th of March 2023 at Brinkworth Recreation Ground Club Rooms between 3pm and 7pm.

The proposed Koolunga Battery Energy Storage System (BESS) is located approximately 1.1km northeast of the Brinkworth Substation on Power Station Road. The BESS has a battery energy storage capacity up to 200MW and discharge capacity up to 800MW which is enough power to supply electricity for up to 26,000 homes for four hours.

The BESS site will be connected to South Australia’s electricity grid via a transmission line that connects to the 275kV Brinkworth Substation. The project will help to secure South Australia’s future electricity demands.

The Koolunga Battery Energy Storage System will allow for increased solar and wind energy to be integrated into the grid helping to reduce volatility and put downward pressure on electricity prices.

Putting downward pressure on electricity prices for Victorians

Melbourne Renewable Energy Hub will store renewable energy for use in Melbourne when it is needed and also absorb excess roof-top solar from Victorian homes as it flows back into the transmission grid.

The project is designed with innovative inverter technology to support the transmission grid's voltage and frequency, and replace 'system inertia' that is lost when coal and gas fired power stations retire over the next decade.

THE LOCAL

COMMUNITY

AND

AND

ENVIRONMENT

Planning and Environment Approvals

Equis has engaged specialist consultants to assess potential environmental impacts and engage with the local community.

The State Planning Commission is the relevant authority for the assessment of this application as the proposed development involves an electricity generating plant with a generating capacity of 5 MW or above connected to the State’s power system.

The Project was granted development approval on the 10th August 2023.

Community benefits

Direct programs to support the local community

110
Construction Jobs
05
Operational Jobs

Partnering and memberships

CEC Logo SvgCeig Logo SvgKinway Logo SvgAHC Logo SvgBBAMZ Logo SvgTCCI Logo Svg
Contact us

Should you have any comments or feedback on the proposed BESS please feel free to contact us below through our Engagement Hub.

Contact us